Latest
issue
GET HCM
magazine
Sign up for the FREE digital edition of HCM magazine and also get the HCM ezine and breaking news email alerts.
Not right now, thanksclose this window I've already subscribed!
Elevate
Elevate
Elevate
Follow Health Club Management on Twitter Like Health Club Management on Facebook Join the discussion with Health Club Management on LinkedIn
FITNESS, HEALTH, WELLNESS

features

Promotional Feature: Site investigation

For any planned leisure development, rigorous site investigations are essential to establish a realistic project cost. Denis O’Brien, senior surveyor from international construction services company ISG – a key Alliance Leisure contractor – explains the basics of the process

Published in Health Club Management 2014 issue 1

For potential leisure projects, how important are the site investigations in the Alliance design and build process?
Site investigations may not be the most exciting part of the process to talk about, but without very detailed and rigorous surveys at this key stage, it’s impossible to come up with a realistic project cost. Alliance Leisure always works to a fixed price contract, so we need to know about every potential pitfall of the proposed development site.

What’s involved?
It depends whether we’re looking at a new build or an extension to an existing facility. There are obviously a lot more unknowns – particularly relating to the ground works – with a site that doesn’t already have a building on it.

We undertake ground investigation surveys, tree surveys, environmental impact surveys, assess the proximity and ease of access to utilities. We also try to look for the potential show-stoppers such as former coal mines or sink holes. Of course, there are always some things you can’t plan for which might significantly delay the start of the project, such as undiscovered munitions or archaeological remains, but in reality these are very rare occurrences.

When it comes to extensions and redevelopments, there’s another whole tier of investigations to carry out before the project can be accurately costed.

The majority of leisure centres we’re now redeveloping date back to the 60s and 70s, so we have to consider the presence of asbestos and the quality of the drains, as well as undertaking structural surveys to see if the existing structure can take the new load.

We also need to check whether the existing services provision is sufficient to supply a larger site, and carry out a dilapidation survey to check structures such as the original roof, which might be nearing the end of its life.

What are the site problems that add most to the budget?
If there are inadequate services, then the need, for example, to build a sub-station could easily add £100,000–£120,000 to the project cost.

With existing leisure centres, it might be that it’s best to knock down a quarter to a third of the existing building in order to properly develop the site.

However, in the case of older buildings, it’s almost always better to plan to replace some elements of the building right at the start, as the payback on this can be relatively quick. For example, we’ll always introduce modern, efficient lighting to any building project we’re working on from top to bottom, as the energy savings this yields over time can enable the leisure centre to recoup the cost of the capital outlay in just a few years.

It’s a false economy to cut elements like this out of the budget just to bring proposed costs down.

How do the site findings feed into the overall process?
On the basis of these investigations, we’re able to carry out a block planning exercise that comes up with the overall size and shape of the development, together with the content and what it will cost (usually within 10–15 per cent of the final fixed cost).

If there are any real show-stoppers at this stage, which is very rare, the client can choose to walk away and just bear the cost of the site investigations.

Sometimes, at this stage, the local authority might want to scale down some elements of the project to make savings.

If they proceed with the plan, the site investigation costs are absorbed into Alliance’s overall development costs. We then go on to commission architects, and draw up a more robust cost plan and a bill of quantities.

CASE STUDY

Jade Jones Pavilion Flint, North Wales

In July 2012, Alliance Leisure completed a £2m extension and refurbishment project at the Jade Jones Pavilion Flint in North Wales.

At the heart of the project was the redevelopment of the sports hall. After carrying out site investigations, Alliance discovered that it needed new pile foundations to take the weight of the new project proposals, which consisted of an eight-lane ten pin bowling alley on the ground floor, and a four-lane flat green bowling rink on a new mezzanine level.

Because of the poor soil structure on the site, Alliance contractor ISG used a mini continuous flight auger piling system to construct new foundations. Although this method comes at a higher cost, it meant minimum vibration and noise for the existing, occupied leisure centre, including the adjacent swimming pool facility. Choosing this building route meant The Pavilion was able to stay open for the entire 28-week build period, and therefore maintain its usual revenue stream.

Other facilities at the leisure centre include a fitness suite, a 25-metre swimming pool and children’s pool, café and licensed bar, and multi-activity studios for fitness and dance classes – along with a new pirate-themed children’s soft play area, which was added as part of the redevelopment project.

Follow the series

1. Scoping / Investigation
2. Conceptualisation
3. Viability assessment & full feasibility
4. Site investigation
5. Fixed price contracts
6. Overseeing the building work
7. Ordering phase
8. Client support (part 1)
9. Client support (part 2)

Sign up here to get HCM's weekly ezine and every issue of HCM magazine free on digital.
The choice of construction method enabled The Pavilion to stay open during the build
The choice of construction method enabled The Pavilion to stay open during the build
Something for everyone - Pavilion Flint offers a flat green bowling for the senior market
Something for everyone - Pavilion Flint offers a flat green bowling for the senior market
Something for everyone - Pavilion Flint offers a fitness suite, as well as a range of new facilities
Something for everyone - Pavilion Flint offers a fitness suite, as well as a range of new facilities
Something for everyone - Pavilion Flint offers a ten pin bowling to appeal to families
Something for everyone - Pavilion Flint offers a ten pin bowling to appeal to families
Something for everyone - Pavilion Flint offers a new pirate-themed kids’ play area
Something for everyone - Pavilion Flint offers a new pirate-themed kids’ play area
https://www.leisureopportunities.co.uk/images/HCM2014_alliance.gif
Part four of a nine-part series detailing Alliance Leisure's process for creating successful public leisure facilities - For any planned leisure development, rigorous site investigations are essential to establish a realistic project cost
International construction services company ISG – Alliance Leisure contractor ,leisure development, rigorous site investigations, project cost, Alliance Leisure,
HCM magazine
We already have an incredible organisation, but we’re humble enough to recognise there are still areas for continued improvement
HCM magazine
HCM People

Cristiano Ronaldo

Footballer and entrepreneur
Taking care of your physical and mental health is essential for a fulfilling life
HCM magazine
As more people join clubs to support their mental health, fitness professionals need to be empowered to take a holistic approach. Kath Hudson shares useful tools discussed at the ACE summit on mental health
HCM magazine
Imposter syndrome about a promotion taught the CEO of SATS that behaving authentically is the most important part of leadership. He talks to Kath Hudson
HCM magazine
Fuel the debate about issues across the industry and share your ideas and experiences. We’d love to hear from you. [email protected]
HCM promotional features
Sponsored
We want our future sports centre to act as a co-location for health and wellbeing services, furthering our connections with GP referrals and digital health platforms
HCM promotional features
Sponsored
Nuffield Health has worked with ServiceSport UK for more than ten years, ensuring the equipment in its clubs is commercially optimised
HCM promotional features
Sponsored
The partnership between PureGym and Belfast-based supplier BLK BOX is transforming the gym floor
HCM promotional features
Sponsored
Francesca Cooper-Boden says health assessment services can boost health club retention
HCM promotional features
Sponsored
The New Keiser M3i Studio Bike brings ride data to life to engage and delight members
HCM promotional features
Sponsored
Epassi, a provider of workplace wellness benefits, is creating a fitter and more productive workforce, one membership at a time 
HCM promotional features
Sponsored
GymNation is pioneering the future of fitness with software specialist Perfect Gym providing a scalable tech platform to power and sustain its growth
HCM promotional features
Sponsored
D2F had updated its brand styling to keep pace with business growth. MD, John Lofting and operations director, Matt Aynsley, explain the rationale
HCM promotional features
Sponsored
Operators, prepare to revolutionise the way members connect with personal trainers in your club, with the ground-breaking Brawn platform.
HCM promotional features
Latest News
Fast Fitness Japan, master franchisee of Anytime Fitness in Japan, has acquired Eighty-8 Health & ...
Latest News
Xplor Technologies has unveiled a financing solution for small businesses, which aims to counter the ...
Latest News
HoloBike, a holographic training bike that simulates trail rides in lifelike 3D, is aiming to ...
Latest News
Peloton Interactive Inc is believed to be working to get its costs under control in ...
Latest News
Equinox, has teamed up with health platform, Function Health, to offer 100 comprehensive laboratory tests, ...
Latest News
Having good levels of cardiorespiratory fitness cuts disease and premature death by 11 to 17 ...
Latest News
US gym chain, Crunch Fitness, has bolstered its global expansion plans with the appointment of ...
Latest News
Active Oxfordshire has received £1.3 million to tackle inactivity and inequality and launch a new ...
Featured supplier news
Featured supplier news: Introducing the Schwinn Z Bike: where innovation meets performance
In the dynamic world of indoor cycling, Schwinn has consistently been at the forefront of innovation. Now, we proudly present the Schwinn Z Bike, the culmination of our legacy of excellence.
Featured supplier news
Featured supplier news: Group exercise complaints now a thing of the past for Reynolds Group
Complaints about group exercise have become a thing of the past for the Reynolds Group thanks to its partnership with CoverMe, a digital platform that simplifies group exercise and PT management for clubs and instructors.
Company profiles
Company profile: PSLT Ltd
PSLT Fitness Solutions manufacture, remanufacture and buy back commercial gym equipment. We supply and maintain ...
Company profiles
Company profile: Power Plate
Power Plate is owned, manufactured and distributed by Northbrook, Ill.- based Performance Health Systems LLC, ...
Supplier Showcase
Supplier showcase - Jon Williams
Catalogue Gallery
Click on a catalogue to view it online
Featured press releases
ABC Trainerize press release: New ABC Trainerize Webinar: How to earn more with clients and members you already have
ABC Trainerize, a leading software platform for the fitness industry, recently ran a webinar for studio and gym owners on how to increase gym revenue with Gym Launch CEO, Cale Owen.
Featured press releases
Alliance Leisure Services (Design, Build and Fund) press release: £26 Million Investment Paves The Way For Health and Wellbeing Hub At Lincolnshire Sport Complex
South Holland District Council has bolstered its successful £20 million UK Government, Levelling Up Fund bid with a £6 million investment to see the Castle Sports Complex in Spalding transformed into a health and wellbeing hub to drive positive health outcomes for residents across the district.
Directory
Lockers
Crown Sports Lockers: Lockers
Salt therapy products
Himalayan Source: Salt therapy products
Spa software
SpaBooker: Spa software
Flooring
Total Vibration Solutions / TVS Sports Surfaces: Flooring
Cryotherapy
Art of Cryo: Cryotherapy
Snowroom
TechnoAlpin SpA: Snowroom
Property & Tenders
Loughton, IG10
Knight Frank
Property & Tenders
Grantham, Leicestershire
Belvoir Castle
Property & Tenders
Diary dates
10-12 May 2024
China Import & Export Fair Complex, Guangzhou, China
Diary dates
23-24 May 2024
Large Hall of the Chamber of Commerce (Erbprinzenpalais), Wiesbaden, Germany
Diary dates
30 May - 02 Jun 2024
Rimini Exhibition Center, Rimini, Italy
Diary dates
08-08 Jun 2024
Worldwide, Various,
Diary dates
11-13 Jun 2024
Raffles City Convention Centre, Singapore, Singapore
Diary dates
12-13 Jun 2024
ExCeL London, London, United Kingdom
Diary dates
03-05 Sep 2024
IMPACT Exhibition Center, Bangkok, Thailand
Diary dates
19-19 Sep 2024
The Salil Hotel Riverside - Bangkok, Bangkok 10120, Thailand
Diary dates
01-04 Oct 2024
REVĪVŌ Wellness Resort Nusa Dua Bali, Kabupaten Badung, Indonesia
Diary dates
22-25 Oct 2024
Messe Stuttgart, Germany
Diary dates
24-24 Oct 2024
QEII Conference Centre, London, United Kingdom
Diary dates
04-07 Nov 2024
In person, St Andrews, United Kingdom
Diary dates

features

Promotional Feature: Site investigation

For any planned leisure development, rigorous site investigations are essential to establish a realistic project cost. Denis O’Brien, senior surveyor from international construction services company ISG – a key Alliance Leisure contractor – explains the basics of the process

Published in Health Club Management 2014 issue 1

For potential leisure projects, how important are the site investigations in the Alliance design and build process?
Site investigations may not be the most exciting part of the process to talk about, but without very detailed and rigorous surveys at this key stage, it’s impossible to come up with a realistic project cost. Alliance Leisure always works to a fixed price contract, so we need to know about every potential pitfall of the proposed development site.

What’s involved?
It depends whether we’re looking at a new build or an extension to an existing facility. There are obviously a lot more unknowns – particularly relating to the ground works – with a site that doesn’t already have a building on it.

We undertake ground investigation surveys, tree surveys, environmental impact surveys, assess the proximity and ease of access to utilities. We also try to look for the potential show-stoppers such as former coal mines or sink holes. Of course, there are always some things you can’t plan for which might significantly delay the start of the project, such as undiscovered munitions or archaeological remains, but in reality these are very rare occurrences.

When it comes to extensions and redevelopments, there’s another whole tier of investigations to carry out before the project can be accurately costed.

The majority of leisure centres we’re now redeveloping date back to the 60s and 70s, so we have to consider the presence of asbestos and the quality of the drains, as well as undertaking structural surveys to see if the existing structure can take the new load.

We also need to check whether the existing services provision is sufficient to supply a larger site, and carry out a dilapidation survey to check structures such as the original roof, which might be nearing the end of its life.

What are the site problems that add most to the budget?
If there are inadequate services, then the need, for example, to build a sub-station could easily add £100,000–£120,000 to the project cost.

With existing leisure centres, it might be that it’s best to knock down a quarter to a third of the existing building in order to properly develop the site.

However, in the case of older buildings, it’s almost always better to plan to replace some elements of the building right at the start, as the payback on this can be relatively quick. For example, we’ll always introduce modern, efficient lighting to any building project we’re working on from top to bottom, as the energy savings this yields over time can enable the leisure centre to recoup the cost of the capital outlay in just a few years.

It’s a false economy to cut elements like this out of the budget just to bring proposed costs down.

How do the site findings feed into the overall process?
On the basis of these investigations, we’re able to carry out a block planning exercise that comes up with the overall size and shape of the development, together with the content and what it will cost (usually within 10–15 per cent of the final fixed cost).

If there are any real show-stoppers at this stage, which is very rare, the client can choose to walk away and just bear the cost of the site investigations.

Sometimes, at this stage, the local authority might want to scale down some elements of the project to make savings.

If they proceed with the plan, the site investigation costs are absorbed into Alliance’s overall development costs. We then go on to commission architects, and draw up a more robust cost plan and a bill of quantities.

CASE STUDY

Jade Jones Pavilion Flint, North Wales

In July 2012, Alliance Leisure completed a £2m extension and refurbishment project at the Jade Jones Pavilion Flint in North Wales.

At the heart of the project was the redevelopment of the sports hall. After carrying out site investigations, Alliance discovered that it needed new pile foundations to take the weight of the new project proposals, which consisted of an eight-lane ten pin bowling alley on the ground floor, and a four-lane flat green bowling rink on a new mezzanine level.

Because of the poor soil structure on the site, Alliance contractor ISG used a mini continuous flight auger piling system to construct new foundations. Although this method comes at a higher cost, it meant minimum vibration and noise for the existing, occupied leisure centre, including the adjacent swimming pool facility. Choosing this building route meant The Pavilion was able to stay open for the entire 28-week build period, and therefore maintain its usual revenue stream.

Other facilities at the leisure centre include a fitness suite, a 25-metre swimming pool and children’s pool, café and licensed bar, and multi-activity studios for fitness and dance classes – along with a new pirate-themed children’s soft play area, which was added as part of the redevelopment project.

Follow the series

1. Scoping / Investigation
2. Conceptualisation
3. Viability assessment & full feasibility
4. Site investigation
5. Fixed price contracts
6. Overseeing the building work
7. Ordering phase
8. Client support (part 1)
9. Client support (part 2)

Sign up here to get HCM's weekly ezine and every issue of HCM magazine free on digital.
The choice of construction method enabled The Pavilion to stay open during the build
The choice of construction method enabled The Pavilion to stay open during the build
Something for everyone - Pavilion Flint offers a flat green bowling for the senior market
Something for everyone - Pavilion Flint offers a flat green bowling for the senior market
Something for everyone - Pavilion Flint offers a fitness suite, as well as a range of new facilities
Something for everyone - Pavilion Flint offers a fitness suite, as well as a range of new facilities
Something for everyone - Pavilion Flint offers a ten pin bowling to appeal to families
Something for everyone - Pavilion Flint offers a ten pin bowling to appeal to families
Something for everyone - Pavilion Flint offers a new pirate-themed kids’ play area
Something for everyone - Pavilion Flint offers a new pirate-themed kids’ play area
https://www.leisureopportunities.co.uk/images/HCM2014_alliance.gif
Part four of a nine-part series detailing Alliance Leisure's process for creating successful public leisure facilities - For any planned leisure development, rigorous site investigations are essential to establish a realistic project cost
International construction services company ISG – Alliance Leisure contractor ,leisure development, rigorous site investigations, project cost, Alliance Leisure,
Latest News
Fast Fitness Japan, master franchisee of Anytime Fitness in Japan, has acquired Eighty-8 Health & ...
Latest News
Xplor Technologies has unveiled a financing solution for small businesses, which aims to counter the ...
Latest News
HoloBike, a holographic training bike that simulates trail rides in lifelike 3D, is aiming to ...
Latest News
Peloton Interactive Inc is believed to be working to get its costs under control in ...
Latest News
Equinox, has teamed up with health platform, Function Health, to offer 100 comprehensive laboratory tests, ...
Latest News
Having good levels of cardiorespiratory fitness cuts disease and premature death by 11 to 17 ...
Latest News
US gym chain, Crunch Fitness, has bolstered its global expansion plans with the appointment of ...
Latest News
Active Oxfordshire has received £1.3 million to tackle inactivity and inequality and launch a new ...
Latest News
Barry’s – known for its HIIT workouts combining treadmills and weights – is thought to ...
Latest News
Consultancy and change architects, Miova, have welcomed industry veteran Mark Tweedie on board. Tweedie had ...
Latest News
US private equity fund, Providence Equity Partners, is acquiring a majority stake in VivaGym from ...
Featured supplier news
Featured supplier news: Introducing the Schwinn Z Bike: where innovation meets performance
In the dynamic world of indoor cycling, Schwinn has consistently been at the forefront of innovation. Now, we proudly present the Schwinn Z Bike, the culmination of our legacy of excellence.
Featured supplier news
Featured supplier news: Group exercise complaints now a thing of the past for Reynolds Group
Complaints about group exercise have become a thing of the past for the Reynolds Group thanks to its partnership with CoverMe, a digital platform that simplifies group exercise and PT management for clubs and instructors.
Company profiles
Company profile: PSLT Ltd
PSLT Fitness Solutions manufacture, remanufacture and buy back commercial gym equipment. We supply and maintain ...
Company profiles
Company profile: Power Plate
Power Plate is owned, manufactured and distributed by Northbrook, Ill.- based Performance Health Systems LLC, ...
Supplier Showcase
Supplier showcase - Jon Williams
Catalogue Gallery
Click on a catalogue to view it online
Featured press releases
ABC Trainerize press release: New ABC Trainerize Webinar: How to earn more with clients and members you already have
ABC Trainerize, a leading software platform for the fitness industry, recently ran a webinar for studio and gym owners on how to increase gym revenue with Gym Launch CEO, Cale Owen.
Featured press releases
Alliance Leisure Services (Design, Build and Fund) press release: £26 Million Investment Paves The Way For Health and Wellbeing Hub At Lincolnshire Sport Complex
South Holland District Council has bolstered its successful £20 million UK Government, Levelling Up Fund bid with a £6 million investment to see the Castle Sports Complex in Spalding transformed into a health and wellbeing hub to drive positive health outcomes for residents across the district.
Directory
Lockers
Crown Sports Lockers: Lockers
Salt therapy products
Himalayan Source: Salt therapy products
Spa software
SpaBooker: Spa software
Flooring
Total Vibration Solutions / TVS Sports Surfaces: Flooring
Cryotherapy
Art of Cryo: Cryotherapy
Snowroom
TechnoAlpin SpA: Snowroom
Property & Tenders
Loughton, IG10
Knight Frank
Property & Tenders
Grantham, Leicestershire
Belvoir Castle
Property & Tenders
Diary dates
10-12 May 2024
China Import & Export Fair Complex, Guangzhou, China
Diary dates
23-24 May 2024
Large Hall of the Chamber of Commerce (Erbprinzenpalais), Wiesbaden, Germany
Diary dates
30 May - 02 Jun 2024
Rimini Exhibition Center, Rimini, Italy
Diary dates
08-08 Jun 2024
Worldwide, Various,
Diary dates
11-13 Jun 2024
Raffles City Convention Centre, Singapore, Singapore
Diary dates
12-13 Jun 2024
ExCeL London, London, United Kingdom
Diary dates
03-05 Sep 2024
IMPACT Exhibition Center, Bangkok, Thailand
Diary dates
19-19 Sep 2024
The Salil Hotel Riverside - Bangkok, Bangkok 10120, Thailand
Diary dates
01-04 Oct 2024
REVĪVŌ Wellness Resort Nusa Dua Bali, Kabupaten Badung, Indonesia
Diary dates
22-25 Oct 2024
Messe Stuttgart, Germany
Diary dates
24-24 Oct 2024
QEII Conference Centre, London, United Kingdom
Diary dates
04-07 Nov 2024
In person, St Andrews, United Kingdom
Diary dates
Search news, features & products:
Find a supplier:
Elevate
Elevate
Partner sites